View Issue Details

IDProjectCategoryView StatusLast Update
0001579T99X171.00 SKB EagleGeneralpublic2023-03-17 08:03
Reporter(ALTech) SH Son Assigned To(MFG) An Tran Due Date
PrioritynormalSeveritys3-moderateReproducibilityhave not tried
Status closedResolutionfixed 
Summary0001579: [ALT] Line transfer (migration)
DescriptionALT FATP Line transfer building from F16 to F07

T99x171.00 (Eagle) and K18X001.00(Swan) both models require a migration plan
TagsNo tags attached.
Attach Tags

Users monitoring this issue

User List (ALTech) BY Lee , (ALTech) Hyunsik Kim , (ALTech) JW Kim , (ALTech) Lonnie Kim , (ALTech) SH Son , (ALTech) Sophie Lee , (ALTech) Sun Choul Joung , (ALTech) SY Yoon , (MFG) An Tran , (MFG) Ben Trinh , (MFG) Yuri Ruan , (PM) Dennis Lu , (PM) Sheila Tu , (PM) Tiffanie Lai , (Sales) Miya Wang

Activities

(ALTech) SH Son

2022-12-21 08:48

developer   ~0011534

Factory migration Plan same as FII's e-mail.

(ALTech) SH Son

2022-12-21 10:00

developer   ~0011536

Hi An, and Miya

Basically the factory(line) migration requires customer approval.
and In some cases, on-site factory audit may be required.
The factory(line) migration is critical part of manufacturing quality.
 
So, FII should be submit the migration plan first. Not only schedule but detailed engineering plan.
The document have to include below contents.
• Factory(line)information : before / after
• Manufacturing and quality validation plan.
• Engineer / worker training plan

I remind that T99x171.00 and K18X001.00 both models require a plan

So, please prepare the plans and document well

we will review and feedback soon.


Thanks
SON

(MFG) An Tran

2022-12-21 11:07

developer   ~0011538

Hi SH Son

Please see my comments:

• Factory(line) information : before / after
---> As i sent email to ALT, i also showed you before and after. Actually, we only change new building, all devices are no any changes.
Could you tell us more detail your requires?
• Manufacturing and quality validation plan.
----> I will update later
• Engineer / worker training plan
-----> They are no any changes.

(ALTech) SH Son

2022-12-21 11:30

developer   ~0011540

HI An,
• Factory(line) information : before / after
---> As i sent email to ALT, i also showed you before and after. Actually, we only change new building, all devices are no any changes.Could you tell us more detail your requires?
 [ALT] Please update below
SMT/PTH line information
ME setup plan and layout. FAC & IT setup plan and layout
Equipment list and layout plan
control run plan

• Manufacturing and quality validation plan.
----> I will update later
• Engineer / worker training plan
-----> They are no any changes.
[ALT] Please add job position / names lists to the document.

Thanks
SON

(MFG) An Tran

2022-12-28 11:04

developer   ~0011597

Hi SH Son

I want to update ALT FATP Line transfer building from F16 to F07 as the attached file.

(ALTech) SH Son

2023-01-03 14:29

developer   ~0011630

Last edited: 2023-01-10 11:08

Hi An,

Please add gauge R&R plan for equipment verification step
 - must include measurement test using golden sample : i.g. TX, RX throughput, LED color, Sound chamber test...
  : add reference : current line measurement result.
 - Each mode( T99x171.00 (Eagle) and K18X001.00(Swan)) requires a plan

Thanks
SON

(ALTech) SH Son

2023-01-16 09:11

developer   ~0011782

Hi An,

Please update your plan about ALT FATP Line transfer building from F16 to F07
0001579:0011597


Thanks
SON

(MFG) An Tran

2023-01-16 21:20

developer   ~0011805

Hi HS Son

I would like to update Gage Repeatability & Reproducibility Report plan as the attachment.

Thanks
An Tran

(MFG) An Tran

2023-01-16 21:34

developer   ~0011806

Hi SH Son

I would like to update Gage Repeatability & Reproducibility Report plan as the attachment.

Thanks
An Tran

(ALTech) SH Son

2023-01-17 10:32

developer   ~0011808

Hi An,

Could you please check again this file?
ALT_Milestone transfer F16 to F07 0116-2.ppt (11,254,272 bytes)

it is same as last you attached file
ALT_Milestone transfer F16 to F07 1228.ppt (10,424,320 bytes)

Thanks
SON

(MFG) An Tran

2023-01-17 10:50

developer   ~0011809

Hi Son

Please help to check paper #7, i already updated GR&R plan for Eagle and SWAN.

Thanks

An

(ALTech) SH Son

2023-01-18 12:50

developer   ~0011824

HI An Tran

can you upload the GR&R report format?
please check it,


Thanks
SON

(MFG) An Tran

2023-01-18 14:25

developer   ~0011826

Hi Son

I would like to upload the GR&R report format as the attached file.

Thanks

An Tran

(ALTech) SH Son

2023-01-20 12:25

developer   ~0011847

Hi An,

the GR&R report format is OK,
Please upload the GR&R report when the test is finished.


Thanks
SON

(ALTech) SH Son

2023-02-06 09:34

developer   ~0012008

Hi An,
Please update status, is on going according to your transfer plan??
 - ALT_Milestone transfer F16 to F07 0116-2.ppt (11,254,272 bytes)


Thanks
SON

(ALTech) SH Son

2023-02-07 15:15

developer   ~0012042

update the schedule from email.

(ALTech) SY Yoon

2023-02-07 19:41

developer   ~0012049

Last edited: 2023-02-07 19:55

Dear Mr. An Tran,

We are confuse your new plan.
Does control run for SWAN delay only 2 days ?
And does control run for Eagle delay 2 weeks ?
Could you make same order of items that you provide before.(https://mantis.cnsbg.foxconn.com/vaas/view.php?id=1579#c11806)

Best Regards,
SuhYoung YOON

(MFG) An Tran

2023-02-08 14:21

developer   ~0012064

Dear Mr. Suh Young YOON

Does control run for SWAN delay only 2 days ?

[An] Yes, only delay 2days. We are pushing our process to set up and verify equipment.

And does control run for Eagle delay 2 weeks ?

[An] We planned to finished 28K(from 02/11~02/20) in current line(at F16) then all equipment will be transfer to new F07 from 02/20.

(MFG) An Tran

2023-02-10 18:38

developer   ~0012125

Hi SH son

I would like to update SWAN and Eagle as the attached file.

Thanks

(ALTech) SH Son

2023-02-14 12:58

developer   ~0012169

Hi An,

Please add detailed control run schedule based on ALT_Milestone transfer F16 to F07 0210 plan.
 - SMT
 - PTH
 - Assembly
 - FT
 - OBA
 - Packing


Thanks
SON

(ALTech) SH Son

2023-02-20 09:16

developer   ~0012251

Hi An Tran

Please check and reply my request

Add detailed control run schedule based on ALT_Milestone transfer F16 to F07 0210 plan.

 - SMT
 - PTH
 - Assembly
 - FT
 - OBA
 - Packing

Thanks
SON

(MFG) An Tran

2023-02-22 09:27

developer   ~0012301

Hi SH son

I would like to update SWAN and Eagle as the attached file.
Thanks

(MFG) An Tran

2023-02-22 10:40

developer   ~0012303

Hi SH son

I would like to update SWAN and Eagle as the attached file.
Update FATP process from 03/01~03/03

Thanks

(ALTech) SH Son

2023-02-23 09:30

developer   ~0012326

HI An,
0001579:0012303
I’m preparing for business trip based on this schedule.

I will send email about this biz trip soon.

Thanks
SON

(MFG) An Tran

2023-02-28 21:01

developer   ~0012382

Hi SH Son

I would like to update line transfer status and audit agenda as the file attachment.
Please let me know if have any issues

Thanks
ALT audit F07 agenda.ppt (10,154,496 bytes)

(MFG) An Tran

2023-03-02 19:08

developer   ~0012411

Dear SH Son

I would like to send you SOP

Thanks
Eagle ASSY SOP G.xlsx (8,629,436 bytes)
Eagle PACK SOP H1.xlsx (16,301,614 bytes)
Eagle TEST SOP G.xlsx (29,820,270 bytes)

(MFG) An Tran

2023-03-03 12:12

developer   ~0012417

Dear SH Son

I would like to send you SWAN SOP, we already updated as audit action.

Thanks
SWAN TEST SOP B1.xlsx (21,219,196 bytes)
SWAN ASSY SOP B1.xlsx (27,752,082 bytes)
SWAN PACK SOP B.xlsx (23,642,602 bytes)

(MFG) An Tran

2023-03-03 15:31

developer   ~0012426

Dear SH Son

I would like to send you SWAN/Eagle GRR.

Thanks
SWAN.7z (1,791,459 bytes)
Eagle.7z (1,105,752 bytes)

(MFG) An Tran

2023-03-03 19:53

developer   ~0012429

Dear Mr SH Son

I would like to update Eagle line transfer report:

1. BFX-AT100 Control Run New FATP F07-3F Result Report
2. Check Led improve solution plan
3. Eagle line transfer report

Thanks

(MFG) An Tran

2023-03-03 19:55

developer   ~0012430

Dear Mr SH Son

I would like to update SWAN Improment fixture report.

Thanks

(MFG) An Tran

2023-03-06 18:42

developer   ~0012442

Dear Mr SH Son

I would like to update SWAN control run report and line transfer report.

Thanks

(ALTech) SH Son

2023-03-07 09:05

developer   ~0012443

Hi An,

Thank you for support about Line transfer report.

Could you please upload each control run STB S/N (Eagle 100pcs, Swan 70pcs)?


Thanks
SON

(MFG) An Tran

2023-03-07 09:32

developer   ~0012444

Hi SH Son

Eagle SN 100pcs: 2149688001202301066001 ~ 2149688001202301066100

SWAN: SN 70pcs: 2149695001202303000001 ~ 2149695001202303000070

Thanks

(ALTech) SH Son

2023-03-08 08:36

developer   ~0012455

HI An
about SWAN Improment fixture Review-20230302.pptx
please more cutting badge area, refer to the attached images

Thanks
SON
image.png (812,978 bytes)
image-2.png (14,874 bytes)   
image-2.png (14,874 bytes)   

(MFG) An Tran

2023-03-09 14:14

developer   ~0012486

Hi SH Son

The cutting badge area has been updated as the attached file.

Thanks

(ALTech) SH Son

2023-03-10 08:55

developer   ~0012495

HI An
    0001579:0012486

Confirm the SWAN Improvement fixture


Thanks
SON

(ALTech) SH Son

2023-03-17 08:03

developer   ~0012560

approved Eagle (T99x171) and Swan(K18x001) FA line transfer F16 to F07 .

Close the this ticket.
Thank you for all of factory support

Issue History

Date Modified Username Field Change
2022-12-21 08:46 (ALTech) SH Son New Issue
2022-12-21 08:48 (ALTech) SH Son Note Added: 0011534
2022-12-21 08:48 (ALTech) SH Son File Added: ALT_Milestone transfer F16 to F07.ppt
2022-12-21 08:49 (ALTech) SH Son Issue Monitored: (ALTech) Sun Choul Joung
2022-12-21 08:49 (ALTech) SH Son Issue Monitored: (ALTech) Hyunsik Kim
2022-12-21 08:49 (ALTech) SH Son Issue Monitored: (ALTech) BY Lee
2022-12-21 08:49 (ALTech) SH Son Issue Monitored: (ALTech) JW Kim
2022-12-21 08:49 (ALTech) SH Son Issue Monitored: (ALTech) Lonnie Kim
2022-12-21 08:49 (ALTech) SH Son Issue Monitored: (ALTech) SH Son
2022-12-21 08:49 (ALTech) SH Son Issue Monitored: (ALTech) Sophie Lee
2022-12-21 08:49 (ALTech) SH Son Issue Monitored: (ALTech) SY Yoon
2022-12-21 08:49 (ALTech) SH Son Issue Monitored: (MFG) An Tran
2022-12-21 08:49 (ALTech) SH Son Issue Monitored: (MFG) Ben Trinh
2022-12-21 08:49 (ALTech) SH Son Issue Monitored: (MFG) Yuri Ruan
2022-12-21 08:49 (ALTech) SH Son Issue Monitored: (PM) Dennis Lu
2022-12-21 08:49 (ALTech) SH Son Issue Monitored: (PM) Sheila Tu
2022-12-21 08:49 (ALTech) SH Son Issue Monitored: (PM) Tiffanie Lai
2022-12-21 08:49 (ALTech) SH Son Issue Monitored: (Sales) Miya Wang
2022-12-21 09:59 (ALTech) SH Son Summary [Eagle] Factory migration => [ALT] Line transfer (migration)
2022-12-21 09:59 (ALTech) SH Son Description Updated
2022-12-21 10:00 (ALTech) SH Son Note Added: 0011536
2022-12-21 10:34 (ALTech) SH Son Assigned To => (MFG) An Tran
2022-12-21 10:34 (ALTech) SH Son Status new => assigned
2022-12-21 11:07 (MFG) An Tran Note Added: 0011538
2022-12-21 11:15 (SW) Kerwin Chen Severity s2-severe => s3-moderate
2022-12-21 11:30 (ALTech) SH Son Note Added: 0011540
2022-12-28 11:04 (MFG) An Tran Note Added: 0011597
2022-12-28 11:04 (MFG) An Tran File Added: ALT_Milestone transfer F16 to F07 1228.ppt
2023-01-03 14:29 (ALTech) SH Son Note Added: 0011630
2023-01-10 11:08 (ALTech) SY Yoon Note Edited: 0011630
2023-01-16 09:11 (ALTech) SH Son Note Added: 0011782
2023-01-16 21:20 (MFG) An Tran Note Added: 0011805
2023-01-16 21:20 (MFG) An Tran File Added: ALT_Milestone transfer F16 to F07 0116.ppt
2023-01-16 21:34 (MFG) An Tran Note Added: 0011806
2023-01-16 21:34 (MFG) An Tran File Added: ALT_Milestone transfer F16 to F07 0116-2.ppt
2023-01-17 10:32 (ALTech) SH Son Note Added: 0011808
2023-01-17 10:50 (MFG) An Tran Note Added: 0011809
2023-01-18 12:50 (ALTech) SH Son Note Added: 0011824
2023-01-18 14:25 (MFG) An Tran Note Added: 0011826
2023-01-18 14:25 (MFG) An Tran File Added: Tester Approval Sheet by GR&R analysis.xlsx
2023-01-20 12:25 (ALTech) SH Son Note Added: 0011847
2023-02-06 09:34 (ALTech) SH Son Note Added: 0012008
2023-02-07 15:15 (ALTech) SH Son Note Added: 0012042
2023-02-07 15:15 (ALTech) SH Son File Added: ALT_Milestone transfer F16 to F07 0203.pdf
2023-02-07 19:41 (ALTech) SY Yoon Note Added: 0012049
2023-02-07 19:55 (ALTech) SY Yoon Note Edited: 0012049
2023-02-08 14:21 (MFG) An Tran Note Added: 0012064
2023-02-10 18:38 (MFG) An Tran Note Added: 0012125
2023-02-10 18:38 (MFG) An Tran File Added: ALT_Milestone transfer F16 to F07 0210.ppt
2023-02-14 12:58 (ALTech) SH Son Note Added: 0012169
2023-02-20 09:16 (ALTech) SH Son Note Added: 0012251
2023-02-22 09:27 (MFG) An Tran Note Added: 0012301
2023-02-22 09:27 (MFG) An Tran File Added: ALT_Milestone transfer F16 to F07 0221.ppt
2023-02-22 10:40 (MFG) An Tran Note Added: 0012303
2023-02-22 10:40 (MFG) An Tran File Added: ALT_Milestone transfer F16 to F07 0222.ppt
2023-02-23 09:30 (ALTech) SH Son Note Added: 0012326
2023-02-28 21:01 (MFG) An Tran Note Added: 0012382
2023-02-28 21:01 (MFG) An Tran File Added: ALT audit F07 agenda.ppt
2023-03-02 19:08 (MFG) An Tran Note Added: 0012411
2023-03-02 19:08 (MFG) An Tran File Added: Eagle ASSY SOP G.xlsx
2023-03-02 19:08 (MFG) An Tran File Added: Eagle PACK SOP H1.xlsx
2023-03-02 19:08 (MFG) An Tran File Added: Eagle TEST SOP G.xlsx
2023-03-03 12:12 (MFG) An Tran Note Added: 0012417
2023-03-03 12:12 (MFG) An Tran File Added: SWAN TEST SOP B1.xlsx
2023-03-03 12:12 (MFG) An Tran File Added: SWAN ASSY SOP B1.xlsx
2023-03-03 12:12 (MFG) An Tran File Added: SWAN PACK SOP B.xlsx
2023-03-03 15:31 (MFG) An Tran Note Added: 0012426
2023-03-03 15:31 (MFG) An Tran File Added: SWAN.7z
2023-03-03 15:31 (MFG) An Tran File Added: Eagle.7z
2023-03-03 19:53 (MFG) An Tran Note Added: 0012429
2023-03-03 19:53 (MFG) An Tran File Added: check Led improve solution plan_03.02.pptx
2023-03-03 19:53 (MFG) An Tran File Added: Eagle Line Transfer Report.pptx
2023-03-03 19:53 (MFG) An Tran File Added: BFX-AT100 Control Run New FATP F07-3F Result Report .pptx
2023-03-03 19:55 (MFG) An Tran Note Added: 0012430
2023-03-03 19:55 (MFG) An Tran File Added: SWAN Improment fixture Review-20230302.pptx
2023-03-06 18:42 (MFG) An Tran Note Added: 0012442
2023-03-06 18:42 (MFG) An Tran File Added: BFX-UA300 Line Transfer Report V1 20230306.pptx
2023-03-06 18:42 (MFG) An Tran File Added: BFX-UA300 Control Run New FATP F07-3F Result Report .pptx
2023-03-07 09:05 (ALTech) SH Son Note Added: 0012443
2023-03-07 09:32 (MFG) An Tran Note Added: 0012444
2023-03-08 08:36 (ALTech) SH Son Note Added: 0012455
2023-03-08 08:36 (ALTech) SH Son File Added: image.png
2023-03-08 08:36 (ALTech) SH Son File Added: image-2.png
2023-03-09 14:14 (MFG) An Tran Note Added: 0012486
2023-03-09 14:14 (MFG) An Tran File Added: SWAN Improment fixture Review-20230309.pptx
2023-03-10 08:55 (ALTech) SH Son Note Added: 0012495
2023-03-17 08:03 (ALTech) SH Son Status assigned => closed
2023-03-17 08:03 (ALTech) SH Son Resolution open => fixed
2023-03-17 08:03 (ALTech) SH Son Note Added: 0012560